New Technology Building - University of Houston
Skip to main content

The three-floor, approximately 75,000-square-foot building will house classrooms, labs and offices for UH Cullen College of Engineering-Technology Division faculty, staff and students. Other features include, wet and dry labs, traditional and Active Learning classrooms, computer labs, student lounge areas and conference spaces. The new facility will be adjacent to the current Technology Building and will open in 2025.

A group of people in suits and hardhats lift shovels with dirt in unison

News

Officials Break Ground on New Technology Building at UH at Sugar Land Instructional Site

The University of Houston celebrated the groundbreaking of a new $65 million academic building in ceremonies at the UH at Sugar Land instructional site. Before faculty, staff, students and community leaders, UH officials turned the dirt for what will become the Technology Building-Sugar Land Academic Building 2 (SAB2). Read more…

At a Glance

  • 75,000Sq Ft
  • 3Floors
  • State-of-ArtClassrooms & Labs
  • 2025Opens
  • $65Million

Conceptual Renderings

3D rendered conceptual image of a 3 story brick building with windows. Trees and people walking are in the foreground.
3D rendered conceptual image of a 3 story brick building with windows. The feeder road of a highway are in the bottom left corner.
3D rendered close up conceptual image of the entrance to a 3 story brick building with windows. People walking are in the foreground.
3D rendered angled close up conceptual image of the entrance to a 3 story brick building with windows. People walking are in the foreground.